TECH REPORT 1

Building Schematic Narrative

TECH REPORT 2

ASHRAE 62.1 & ASHRAE 55 Evaluations

TECH REPORT 3

Click Here to read

Technical Report 3

NEWSFEED UPDATES

12-07-2018

12-10-2018

10-29-2018

10-17-2018

10-26-2018

09-22-2018

09-07-2018

09-04-2018

08-31-2018

08-29-2018

08-27-2018

08-20-2018

08-03-2018

07-27-2018

Final Fall CPEP Check

Abstract Posted 

Building Statistics 2 Posted

Technical Report 2 Submitted

Technical Report 1 Submitted

CPEP Home Page Draft

Building Statistics Part 1

Project Initiation Checklist Part 2

Resume Posted

Project Initiation Checklist Part 1

Obtained Building Documentation

Owner Permission Received

01-14-2019

04-29-2019

04-29-2019

04-29-2019

CPEP Site Completed and Ready for Review

While great efforts have been taken to provide accurate and complete information on the pages of CPEP, please be aware that the information contained herewith is considered a work‐in progress for this thesis project. Modifications and changes related to the original building designs and construction methodologies for this senior thesis project are solely the interpretation of Christopher Ankeny. Changes and discrepancies in no way imply that the original design contained errors or was flawed. Differing assumptions, code references, requirements, and methodologies have been incorporated into this thesis project; therefore, investigation results may vary from the original design.